Grass Removal, Base & Paving Project
A low spot that never dried out
This job started as a grassy gap between two paved sections of the same lot — the kind of low spot that holds standing water after every rain instead of draining off. It sat right against the edge of an existing cracked lot, so the problem was easy to see every time it rained.
A grassy low spot that holds water isn’t just an eyesore — it’s the first sign the ground underneath needs real base work, not just grass seed.
Grade, compact, pave
The grass and topsoil came out first, then base material went in and got compacted before any asphalt was laid. Once the base was solid, the gap was paved to tie the two lot sections into one continuous surface.
One connected surface, no more standing water
What used to be a soft, flooded strip between two paved areas is now one solid surface, level with the lot on either side. Skipping straight to asphalt without the grading and compaction step is exactly how a spot like this ends up soft and cracking again within a year — doing the base work first is what makes it hold.
Get a Free Estimate
Grading, base work, and paving for lots and driveways across Pinellas County.
Request Your Free Estimate



